Conventional Empires

24th of January was a moment of celebration as the German shipyard opened. German scientists and engineers had worked around the clock to ensure that SMS Scharnhorst could be laid down immediately:

Scharnhorst class Survey Corvette      4,000 tons       90 Crew       369.3 BP       TCS 80    TH 30    EM 0
375 km/s      Armour 1-22       Shields 0-0       HTK 22      Sensors 0/0/0/1.0      DCR 1-2      PPV 0
Maint Life 1.62 Years     MSP 57    AFR 128%    IFR 1.8%    1YR 26    5YR 383    Max Repair 50 MSP
Fregattenkapitän    Control Rating 1   BRG   
Intended Deployment Time: 12 months    CDE 10%    Morale Check Required    

AG Vulcan Con-Eng 10/10-100 (3)    Power 30    Fuel Use 100%    Signature 10    Exp 10%
Fuel Capacity 585,800 Litres    Range 26.4 billion km (813 days at full power)

Conventional Geological Survey Sensors (5)   1.0 Survey Points Per Hour

This design is classed as a Military Vessel for maintenance purposes
This design is classed as a Survey Ship for auto-assignment purposes

However, what they had not realized was that the shipyard was only capable of assembling a 1,000 ton aether vessels at first. While the workers continued to expand the yard, factories back in Germany were tasked to built as many components as possible to ensure that, once the shipyard was big enough, the survey corvette could be built in a rapid manner.

By mid-February, the British learned about the German plans and grew concerned enough to revisit their Sojourn class scout design. Hastily stripping it down to only one sensor and one engine, it would be just 2,200 tons. To ensure that the Union Jack would fly first on Odin, Admiralty ordered components to be built by industry.

Sojourn class Scout      2,200 tons       45 Crew       131.9 BP       TCS 44    TH 25    EM 0
568 km/s      Armour 1-15       Shields 0-0       HTK 10      Sensors 0/0/0/0.2      DCR 1-4      PPV 0
Maint Life 3.09 Years     MSP 37    AFR 39%    IFR 0.5%    1YR 6    5YR 87    Max Repair 50 MSP
Lieutenant    Control Rating 1   BRG   
Intended Deployment Time: 12 months    CDE 10%    Morale Check Required    

Vulcan Con-Eng 25/25-100 (1)    Power 25    Fuel Use 63.25%    Signature 25    Exp 10%
Fuel Capacity 253,800 Litres    Range 32.8 billion km (668 days at full power)

Conventional Geological Survey Sensors (1)   0.2 Survey Points Per Hour

This design is classed as a Military Vessel for maintenance purposes
This design is classed as a Survey Ship for auto-assignment purposes

On 27th February, American scientists alerted Washington to the fact that, it was highly likely that anything found on Odin would be useless unless there were men present with specialist knowledge, something they called Xenoarchaeology. Furthermore, these xenoarchaeologists would need special equipment to survive and work on hostile environments. Their case was heard and the US changed its research priorities. Europeans might get to Odin first but it was going to be the Americans who solved its mysteries.

On 18th September, Austria became the final power to discover Conventional Advanced Composite Armour. This delay was due to their lack of a proper DS scientist. They also continued with Xenoarchaeology research.

The year ended with construction starting on the Japanese shipyard, leaving Italy as the last power to have not even started constructing a shipyard yet.

4 Likes